NH
Rolfe Canal Hydro P-3240
General information | |
| Waterway |
Contoocook River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-3240 |
| FERC project name | Rolfe Canal |
| Permit issued | 11/30/84 |
| Permit expiration | 11/26/24 |
Ownership and operation | |
| Owner | Briar-Hydro Associates |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1987 |
| Transmission or distribution system owner | Unitil Energy Systems |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 4.3 MW |
| Average annual net hydropower generation | 21,836.7 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

