Rush Creek P-1389
General information | |
| Waterway |
Rush Creek |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-1389 |
| FERC project name | Rush Creek |
| Permit issued | 1/30/97 |
| Permit expiration | 1/27/27 |
Ownership and operation | |
| Owner | Southern California Edison Co |
| Owner type | Investor-Owned Utility |
| Year first online (conventional hydro) | 1916 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 13.1 MW |
| Average annual net hydropower generation | 35,816.9 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From California Trout 10/12/21
Major Milestone Met to Protect Mono Basin Ecosystem
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025