ID
S E Hazelton A P-10164
General information | |
| Waterway |
North Side Main Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-10164 |
| FERC project name | Hazelton A |
| Permit issued | 8/6/87 |
Ownership and operation | |
| Owner | Enel North America, Inc. |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1990 |
| Transmission or distribution system owner | Idaho Power Co |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 8.4 MW |
| Average annual net hydropower generation | 22,972.5 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

