CA
San Dimas P-2896
General information | |
| Waterway |
River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-2896 |
| FERC project name | MWD 1979 Five Conduit Plants |
| Other projects with this FERC number | |
| Permit issued | 8/11/79 |
Ownership and operation | |
| Owner | Metropolitan Water District of S CA |
| Owner type | State |
| Year first online (conventional hydro) | 1981 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 9.9 MW |
| Average annual net hydropower generation | 39,305.4 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

