CA
San Gabriel Hydro Project P-8764
General information | |
| Waterway |
San Gabriel River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-8764 |
| FERC project name | San Gabriel |
| Permit issued | 1/16/86 |
Ownership and operation | |
| Owner | Los Angeles County-San Gabriel |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1987 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 5.0 MW |
| Average annual net hydropower generation | 6,396.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

