CA
Sand Bar Power Plant P-2975
General information | |
Waterway |
Middle Fork Stanislaus River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2975 |
FERC project name | Sand Bar |
Permit issued | 9/3/83 |
Permit expiration | 8/27/33 |
Ownership and operation | |
Owner | Tri-Dam Power Authority |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1986 |
Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 16.2 mW |
Average annual net hydropower generation | 77,307.0 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited3/23/2023
NOAA biological opinion unrealistic for Kennebec River recovery
From South Yuba River Citizens League3/20/2023
SYRCL’s 40th Anniversary Film YUBA IS THE HEART is now available to view.