Sand Cove P-9281
General information | |
| Waterway |
Santa Clara River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-9281 |
| FERC project name | Santa Clara |
| Other projects with this FERC number | |
| Permit issued | 4/4/86 |
Ownership and operation | |
| Owner | PacifiCorp |
| Owner type | Investor-Owned Utility |
| Year first online (conventional hydro) | 1920 |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.8 MW |
| Average annual net hydropower generation | 318.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025