CA

Santa Ana 1 P-1933

General information

Waterway  Santa Ana River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-1933
Permit issued 7/3/2003
Permit expires 6/26/2033

Ownership and operation

Owner Southern California Edison Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1899
Transmission or distribution system owner Southern California Edison Co

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 3.2 mW
Average annual net hydropower generation 3,644.7 mWH

From our Resource Library

License summaries, Pacific

Pit 3, 4, 5 Project, Pit River, California

See all resources