GA

Sinclair P-1951

General information

Waterway  Oconee River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-1951
FERC project name Sinclair
Permit issued 3/14/96
Permit expiration 4/26/36

Ownership and operation

Owner Georgia Power Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1953
Transmission or distribution system owner Georgia Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 45.0 MW
Average annual net hydropower generation 100,923.9 MWH

Is there something you’d like to add or correct? Please let us know.