Soldier Canyon Micro Hydro Facility CD15-18

General information

Waterway  Soldier Canyon Pipeline
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD15-18
Permit issued 7/31/15

Ownership and operation

Owner Soldier Canyon Filter Plant
Owner type Political subdivision
Year first online (conventional hydro) 2018

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.1 MW
Average annual net hydropower generation 880.0 MWH