CO
South Canal Hydro-3
General information | |
Waterway |
Gunnison River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | Lease of Power Privilege |
Ownership and operation | |
Owner | Delta-Montrose Electric Association |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 2013 |
Transmission or distribution system owner | Delta Montrose Electric Assn |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 3.5 mW |
Average annual net hydropower generation | 11,064.5 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From American Whitewater5/31/2023
From South Yuba River Citizens League5/31/2023
The Supreme Court’s Decision on Sackett and What That Means for the Yuba Watershed