WA
South Fork Tolt P-2959
General information | |
| Waterway |
South Fork Tolt River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2959 |
| FERC project name | Tolt River - South Fork |
| Permit issued | 3/24/84 |
| Permit expiration | 7/15/29 |
Ownership and operation | |
| Owner | Seattle City of |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1995 |
| Transmission or distribution system owner | City of Seattle - (WA) |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 16.8 MW |
| Average annual net hydropower generation | 55,739.5 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

