CA
Spaulding 1 P-2310
General information | |
Waterway |
South Yuba River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2310 |
FERC project name | Drum-Spaulding |
Other projects with this FERC number | |
Permit issued | 6/19/63 |
Permit expiration | 4/26/13 |
Ownership and operation | |
Owner | Pacific Gas & Electric Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1928 |
Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 7.0 mW |
Average annual net hydropower generation | 30,202.0 mWH |
News and updates
From American Whitewater8/12/2022
From Friends of the River8/10/2022
Resolution of the Section 401 Clean Water Act cases and the FPA pre-emption case