OR

SPS2 Hydro Project CD15-28

General information

Waterway  Westside Ditch
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD15-28
Permit issued 7/30/15

Ownership and operation

Owner SPS of Oregon
Owner type Private Non-utility
Year first online (conventional hydro) 2016

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.0 MW
Average annual net hydropower generation 81.9 MWH

Is there something you’d like to add or correct? Please let us know.