NH
Steels Pond P-3265
General information | |
| Waterway |
North Branch Contoocook River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-3265 |
| FERC project name | Steeles Pond |
| Permit issued | 10/13/83 |
Ownership and operation | |
| Owner | Steels Pond Hydro, Inc. & NH DES, Water Division, Dam Bureau |
| Owner type | Private Non-utility |
| Year first online (conventional hydro) | 1984 |
Power and generating capacity | |
| Number of units | 5 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.0 MW |
| Average annual net hydropower generation | 3,040.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

