Swinging Bridge 2 P-10482

General information

Waterway  Mongaup River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-10482
Permit issued 4/9/1992
Permit expires 3/27/2022

Ownership and operation

Owner AER NY Gen LLC
Owner type Private Non-utility
Year first online (conventional hydro) 1939
Transmission or distribution system owner Orange & Rockland Utils Inc

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 8.0 mW
Average annual net hydropower generation 10,374.3 mWH