CA
Tank 3 CD14-16
General information | |
| Waterway |
Conduit/Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Qualifying Conduit |
FERC information | |
| FERC docket # | CD14-16 |
| Permit issued | 5/28/14 |
Ownership and operation | |
| Owner | El Dorado Irrigation District |
| Owner type | Publicly Owned Utility |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.6 MW |
| Average annual net hydropower generation | 2,900.0 MWH |