Tank 3 CD14-16
General information | |
Waterway | Conduit/Canal |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Qualifying Conduit |
FERC information | |
FERC docket # | CD14-16 |
Permit issued | 5/28/2014 |
Ownership and operation | |
Owner | El Dorado Irrigation District |
Owner type | Publicly Owned Utility |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 0.6 mW |
Average annual net hydropower generation | 2,900.0 mWH |