CA
Tank 4 In-Conduit P-14463
General information | |
Waterway |
Water Treatment Plant |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-14463 |
FERC project name | Tank 4 In-Conduit |
Permit issued | 2/3/13 |
Ownership and operation | |
Owner | City of Avenal, California |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 2015 |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 0.1 MW |
Average annual net hydropower generation | 424.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout6/6/2025
Six Things to Know about the Potter Valley Project and Eel River Restoration
From California Sportfishing Protection Alliance4/28/2025
PG&E proposes “rapid removal” plan for Cape Horn and Scott dams on the Eel River