CA
Temescal P-5938
General information | |
| Waterway |
Metropolitan Water District Lower Pipeline Feeder |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-5938 |
| FERC project name | Temescal |
| Permit issued | 5/16/82 |
Ownership and operation | |
| Owner | Metropolitan Water District of S CA |
| Owner type | State |
| Year first online (conventional hydro) | 1983 |
| Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 2.9 MW |
| Average annual net hydropower generation | 13,545.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

