OR
Three Sisters Irrigation District Hydroelectric Project P-14364
General information | |
| Waterway |
Three Sisters Irrigation Main Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-14364 |
| FERC project name | Three Sisters Irrigation |
| Permit issued | 4/7/12 |
Ownership and operation | |
| Owner | Three Sisters Irrigation District |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 2015 |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.7 MW |
| Average annual net hydropower generation | 3,400.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

