WA

Tieton P-3701

General information

Waterway  Tieton River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-3701
Permit issued 6/22/1991
Permit expires 5/27/2041

Ownership and operation

Owner Southern California Public Power Authority
Owner type Publicly Owned Utility
Year first online (conventional hydro) 2006
Transmission or distribution system owner Benton Rural Electric Assn

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 13.8 mW
Average annual net hydropower generation 52,166.8 mWH

From our Resource Library