Tieton P-3701
General information | |
Waterway |
Tieton River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-3701 |
FERC project name | Tieton Dam |
Permit issued | 6/22/91 |
Permit expiration | 5/27/41 |
Ownership and operation | |
Owner | Southern California Public Power Authority |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 2006 |
Transmission or distribution system owner | Benton Rural Electric Assn |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 13.8 MW |
Average annual net hydropower generation | 52,166.8 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From California Trout6/6/2025
Six Things to Know about the Potter Valley Project and Eel River Restoration
From California Sportfishing Protection Alliance4/28/2025
PG&E proposes “rapid removal” plan for Cape Horn and Scott dams on the Eel River