MI

Tippy P-2580

General information

Waterway  Manistee River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-2580
FERC project name Tippy
Permit issued 7/10/94
Permit expiration 6/26/34

Ownership and operation

Owner Consumers Energy Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1918
Transmission or distribution system owner ITC Transmission

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 20.1 MW
Average annual net hydropower generation 60,218.4 MWH
  • Two existing earth embankment dam sections
  • An impoundment with storage area of 1,100 acre-feet
  • A powerhouse containing 3 generating units
  • Transmission facilities, and appurtenant facilities
  • Stronach Dam, on the tributary Pine River which flows into the mainstem Tippy impoundment

For a detailed description of this project and the Hodenphyl project included in the Consumers Settlement Agreement, read this summary.

Is there something you’d like to add or correct? Please let us know.

Related resources

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates