MI
Tippy P-2580
General information | |
Waterway |
Manistee River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2580 |
FERC project name | Tippy |
Permit issued | 7/10/94 |
Permit expiration | 6/26/34 |
Ownership and operation | |
Owner | Consumers Energy Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1918 |
Transmission or distribution system owner | ITC Transmission |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 20.1 MW |
Average annual net hydropower generation | 60,218.4 MWH |
- Two existing earth embankment dam sections
- An impoundment with storage area of 1,100 acre-feet
- A powerhouse containing 3 generating units
- Transmission facilities, and appurtenant facilities
- Stronach Dam, on the tributary Pine River which flows into the mainstem Tippy impoundment
For a detailed description of this project and the Hodenphyl project included in the Consumers Settlement Agreement, read this summary.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition