PA
Townsend Hydro P-3451
General information | |
Waterway | Beaver River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-3451 |
FERC project name | Townsend |
Permit issued | 8/12/1984 |
Permit expires | 7/27/2024 |
Ownership and operation | |
Owner | Beaver Falls Municipal Auth |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1987 |
Transmission or distribution system owner | Duquesne Light Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 5.2 mW |
Average annual net hydropower generation | 18,409.8 mWH |
News and updates
From Trout Unlimited2/26/2021
From California Trout2/26/2021