Townsend Hydro P-3451

General information

Waterway  Beaver River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-3451
Permit issued 8/12/1984
Permit expires 7/27/2024

Ownership and operation

Owner Beaver Falls Municipal Auth
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1987
Transmission or distribution system owner Duquesne Light Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 5.2 mW
Average annual net hydropower generation 18,409.8 mWH