CA

Tule River P-1333

General information

Waterway  North Fork Tule River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-1333
FERC project name Tule River
Permit issued 12/25/93
Permit expiration 7/27/33

Ownership and operation

Owner Pacific Gas & Electric Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1914
Transmission or distribution system owner Pacific Gas & Electric Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 8.4 MW
Average annual net hydropower generation 14,529.8 MWH

Is there something you’d like to add or correct? Please let us know.