RI

Tupperware P-3023

General information

Waterway  Blackstone River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-3023
FERC project name Blackstone
Permit issued 10/19/80
Permit expiration 9/26/20

Ownership and operation

Owner Blackstone Hydro Inc.
Owner type Wholesale Power Marketer
Year first online (conventional hydro) 1981
Transmission or distribution system owner The Narragansett Electric Co

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 1.6 MW
Average annual net hydropower generation 4,554.7 MWH

Is there something you’d like to add or correct? Please let us know.