ME

Veazie Energy Recovery Hydro Plant P-13164

General information

Waterway  Bangor Water District water supply pipeline
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-13164
FERC project name Veazie Energy Recovery
Permit issued 1/11/09

Ownership and operation

Owner Bangor Water District
Owner type Publicly Owned Utility
Year first online (conventional hydro) 2011

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.1 MW
Average annual net hydropower generation 590.0 MWH

Is there something you’d like to add or correct? Please let us know.

Related resources

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates