CA
Verdugo Metropolitan Powerhouse P-6352
General information | |
| Waterway |
Metropolitan Water District Pipeline |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-6352 |
| FERC project name | Verdugo Metropolitan Pump Station |
| Permit issued | 6/12/82 |
Ownership and operation | |
| Owner | City of Glendale |
| Owner type | Publicly Owned Utility |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.4 MW |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

