GA
Walter F George
General information | |
| Waterway |
Chattahoochee River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | US Army Corps of Engineers |
Ownership and operation | |
| Owner | USCE-Mobile District |
| Owner type | USACE |
| Year first online (conventional hydro) | 1963 |
| Transmission or distribution system owner | Alabama Power Co |
Power and generating capacity | |
| Number of units | 4 |
| Total capacity from hydraulic turbine-generator units within each plant | 168.0 MW |
| Average annual net hydropower generation | 349,574.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

