OR
Watson Net Meter/Micro Hydroelectric Demonstration Facility CD16-13
General information | |
Waterway |
Whychus Creek |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Qualifying Conduit |
FERC information | |
FERC docket # | CD16-13 |
Permit issued | 7/30/16 |
Ownership and operation | |
Owner | Three Sisters Irrigation Distric |
Owner type | Political subdivision |
Year first online (conventional hydro) | 2019 |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 0.2 mW |
Average annual net hydropower generation | 583.3 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From American Whitewater5/31/2023
From South Yuba River Citizens League5/31/2023
The Supreme Court’s Decision on Sackett and What That Means for the Yuba Watershed