OR

Watson Net Meter/Micro Hydroelectric Demonstration Facility CD16-13

General information

Waterway  Whychus Creek
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD16-13
Permit issued 7/30/16

Ownership and operation

Owner Three Sisters Irrigation Distric
Owner type Political subdivision
Year first online (conventional hydro) 2019

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 0.2 MW
Average annual net hydropower generation 583.3 MWH

Is there something you’d like to add or correct? Please let us know.