CA
Whitewater Hydro Plant P-4294
General information | |
Waterway | Colorado Aqueduct |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-4294 |
Permit issued | 10/9/1981 |
Ownership and operation | |
Owner | Desert Water Agency |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1986 |
Transmission or distribution system owner | Southern California Edison Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 1.3 mW |
Average annual net hydropower generation | 2,287.6 mWH |
News and updates
From Trout Unlimited2/26/2021
From California Trout2/26/2021