Willow Island Hydro Station P-6902
General information | |
Waterway | Ohio River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-6902 |
Permit issued | 9/22/1989 |
Permit expires | 8/27/2039 |
Ownership and operation | |
Owner | AMERICAN MUNICIPAL POWER, INC |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 2016 |
Transmission or distribution system owner | American Transmission Systems Inc |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 44.0 mW |
Average annual net hydropower generation | 167,510.5 mWH |