Yates Dam P-2407

General information

Waterway  Tallapoosa River
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-2407
Permit issued 1/29/1994
Permit expires 1/27/2034

Ownership and operation

Owner Alabama Power Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1928
Transmission or distribution system owner Alabama Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 50.5 mW
Average annual net hydropower generation 122,053.7 mWH