Search options

In state/territory

Current status

Active license(8)

Type of facility

Conventional Hydro(8)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Peaking(2)
Reregulating(1)
Run-of-river/Upstream Peaking(5)
Canal/Conduit(0)
Diversion(0)
Run-of-river(0)
Run-of-river/Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(8) [+]
FERC License(8)
FERC Exemption(0)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   

Displaying
1-5 of 8
results

MT

Black Eagle P-2188

 Active license / Conventional Hydro

FERC project name: Missouri-Madison

MT

Cochrane P-2188

 Active license / Conventional Hydro

FERC project name: Missouri-Madison

MT

Hauser P-2188

 Active license / Conventional Hydro

FERC project name: Missouri-Madison

MT

Holter P-2188

 Active license / Conventional Hydro

FERC project name: Missouri-Madison

MT

Madison P-2188

 Active license / Conventional Hydro

FERC project name: Missouri-Madison

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy