Search options

In state/territory

Current status

Active license(16)
Non-operating(1)

Type of facility

Conventional Hydro(16)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Run-of-river(12)
Canal/Conduit(0)
Diversion(0)
Peaking(0)
Reregulating(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(13) [+]
FERC License(13)
FERC Exemption(0)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Mississippi River

Displaying
1-5 of 16
results

MN

A-Mill Artist Lofts P-14628

 Active license / Conventional Hydro

FERC project name: A-Mill Artist Lofts

MN

Blanchard P-346

 Active license / Conventional Hydro

FERC project name: Blanchard

MN

Brainerd P-2533

 Active license / Conventional Hydro

FERC project name: Brainerd

MN

Crown Mill Hydroelectric P-11175

 Active license / Conventional Hydro

FERC project name: Crown Mill

MN

Grand Rapids P-2362

 Active license / Conventional Hydro

FERC project name: Grand Rapids

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy