Search options

In state/territory

Current status

Active license(4)

Type of facility

Conventional Hydro(4)
Pumped Storage(0)

Definitions

Mode of hydropower operation

Run-of-river(3)
Canal/Conduit(0)
Diversion(0)
Peaking(0)
Reregulating(0)
Run-of-river/Peaking(0)
Run-of-river/Upstream Peaking(0)
See 4 moreSee less

Definitions

 Conventional generating capacity

 Pumped storage generating capacity

Owner

Waterway

Permit type

FERC(4) [+]
FERC License(3)
FERC Exemption(1)
FERC Qualifying Conduit(0)
Dept of Interior(0)
IBWC(0)
Not Required(0)
Reclamation(0) [+]
Lease of Power Privilege(0)
Other(0)
Transferred(0)
TVA(0)
US Army Corps of Engineers(0)

FERC license expiration date range

Map
List
Active filters:   
  • Waterway: Oak Grove Fork Clackamas River

Displaying
4
results

OR

Canyon Creek P-6414

 Active license / Conventional Hydro

FERC project name: Canyon Creek

OR

Oak Grove P-2195

 Active license / Conventional Hydro

FERC project name: Clackamas River

OR

Stone Creek P-5264

 Active license / Conventional Hydro

FERC project name: Stone Creek

OR

Timothy Lake Powerhouse P-2195

 Active license / Conventional Hydro

FERC project name: Clackamas River

 


The Hydropower Reform Coalition is proud to offer this interactive resource that combines data from the Oak Ridge National Laboratory (ORNL), the Federal Energy Regulatory Commission (FERC), American Rivers, and our own members’ contributions and insights.

<
>
Clear
BESbswy