Henry Jackson, Sultan River, Washington

Henry Jackson, Sultan River, Washington

The Jackson Project is located on the Sultan River in northwestern Washington. The project’s authorized capacity is 111.8 megawatts (MW). The project is located on the Sultan River, 20 miles east of the City of Everett, Washington, in Snohomish County. The project occupies 10.9 acres of the Mount Baker-Snoqualmie National Forest administered by the U.S. Forest Service (Forest Service). Updated in 2020.

Enloe Project, Similkameen River, Washington

Enloe Project, Similkameen River, Washington

The Enloe Hydroelectric project is one for which a new license has been issued to construct, operate and maintain by the Public Utility District No. 1 of Okanogan County (Okanogan PUD). The project site is located on land managed by the Bureau of Land Management (BLM).

Clackamas Project, Clackamas River, Oregon

Clackamas Project, Clackamas River, Oregon

The Clackamas River Project is located within the Clackamas River Basin which drains more than 940 square miles. It flows west from the Cascade Mountain Range for 83 miles to its confluence with the Willamette River at Oregon City, Oregon. Most of the headwaters are located within the Mt. Hood National Forest, and approximately 47 miles of the Clackamas River are designated as a federal Wild and Scenic River.