Henry Jackson, Sultan River, Washington

HRC or member-contributed

From:

Hydropower Reform Coalition

 

  View PDF

License SummariesNorthwestPublished   2/1/2020

The Jackson Project is located on the Sultan River in northwestern Washington. The project’s authorized capacity is 111.8 megawatts (MW). The project is located on the Sultan River, 20 miles east of the City of Everett, Washington, in Snohomish County. The project occupies 10.9 acres of the Mount Baker-Snoqualmie National Forest administered by the U.S. Forest Service (Forest Service). Downstream of the project’s Culmback dam at Spada Lake, the Sultan River flows through a deep forested gorge for nearly 14 miles. The project powerhouse is located near the downstream end of the gorge.

The District (Public Utility District No. 1 of Snohomish County) currently operates the project to satisfy the City of Everett’s municipal water supply needs, protect aquatic resources, maintain Spada lake levels for summer recreation, and generate electricity. The new license requires additional measures to protect and enhance water quality, fish, wildlife, recreation, and cultural resources.

The twelve signatories to the Settlement Agreement are the District, National Marine Fisheries Service (NMFS), Forest Service; U.S. Fish and Wildlife Service (FWS), U.S. National Park Service, Washington Department of Fish and Wildlife (Washington DFW), Washington Department of Ecology (Ecology), Tulalip Tribes of Washington (Tulalip Tribes), Snohomish County, Washington; City of Everett; City of Sultan; and American Whitewater.

License summary originally prepared in 2014. Updated in 2020 in partnership with River Management Society.

Related hydro projects

More from our resource librarySee all

License Summaries › Southeast   3/1/2014

W Kerr Scott, Yadkin River, South Carolina