Hyrum Project, Blacksmith River, Utah

HRC or member-contributed

From:

Hydropower Reform Coalition

 

  View PDF

License SummariesMountain WestPublished   3/1/2014

The City of Hyrum owns and operates the project, which was originally constructed in 1931. The project is located in the Blacksmith Fork Canyon within the Wasatch Cache National Forest and is operated in run-of-river mode.

More from our resource librarySee all

License Summaries › Pacific   3/1/2015

Chili Bar Project, South Fork American River, California