Hydropower license summaries   /  Published 1/1/2008

Stockport will develop a WQ monitoring plan which will include measures to enhance dissolved oxygen (DO) when it falls below 5 mg/L. When the DO level falls below 5 mg/L, the project is required to be shut down.

HRC or member-contributed resource

Contributed by:

Hydropower Reform Coalition

 

View PDF

Related resource

Hydropower license summaries

Mystic Lake, West Rosebud Creek, Montana

The Mystic Lake Hydroelectric Project is located on West Rosebud Creek, in Stillwater and Carbon counties about 75 miles southwest of Billings, in southern Montana. The project began operation in 1925 and received its last operating license in 2007 and became the first project to do so using the Federal Energy Regulatory Commission’s Integrated Licensing Process (ILP.)