Eel Weir Project, Presumpscot River, Maine

Hydropower license summaries

The Eel Weir Project is located at the outlet of Sebago Lake near the cities of Standish and Windham, in Cumberland County, about 14 miles northwest of Portland, Maine. The Presumpscot River originates at the outlet of Sebago Lake and flows in a southeasterly direction for about 25 miles before emptying into the Atlantic Ocean at Casco Bay.

  HRC or member-contributed resource

Contributed by:

Hydropower Reform Coalition

 

View PDF

Related resource

Hydropower license summaries

W Kerr Scott, Yadkin River, South Carolina

Wilkesboro Hydroelectric Company, LLC proposes to construct, operate, and maintain a new 4-megawatt (MW) facility using the existing W. Kerr Scott Dam and Reservoir, which are owned and operated by the Army Corps of Engineers (Corps). The W. Kerr Scott Dam and Reservoir were constructed by the Corps and became operational in 1963 to provide flood control, water supply, recreation, and low flow releases.