This report on the since-abandoned hydro project at Jackson Lake Dam examines the legal and policy limitations on building a hydro project in a National Park, as well as some implications of the project if it had been built as proposed.
Hydropower at Jackson Lake Dam, Grand Teton National Park: Probabilities and Implications
Articles, fact sheets, reportsPublished 8/8/2017
More from our resource librarySee all
|
Articles, fact sheets, reports › Topic › Reservoir Emissions 1/9/2017
Reservoir Water-Level Drawdowns Accelerate and Amplify Methane Emission |

HRC or member-contributed