by Colleen McNally-Murphy | Jan 1, 2020
This study aims to evaluate the feasibility of integrating a battery storage system (BSS) with the hydropower plants at Wilder, Bellows Falls, and Vernon as an alternative to the current stored hydropower system. The driving questions guiding this study are: Should...