GA
Allatoona
General information | |
Waterway |
Etowah River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Mobile District |
Owner type | USACE |
Year first online (conventional hydro) | 1950 |
Transmission or distribution system owner | Georgia Power Co |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 86.6 MW |
Average annual net hydropower generation | 102,696.3 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024