Don Pedro P-2299

General information

Waterway  Tuolumne River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-2299
FERC project name New Don Pedro
Permit issued 3/5/64
Permit expiration 4/26/16

Ownership and operation

Owner Turlock Irrigation District
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1971
Transmission or distribution system owner Turlock Irrigation District

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 170.8 MW
Average annual net hydropower generation 360,496.5 MWH