MA
Dwight P-10675
General information | |
| Waterway |
Chicopee River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-10675 |
| FERC project name | Dwight |
| Permit issued | 9/6/92 |
Ownership and operation | |
| Owner | Nautilus Hydro, LLC |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1920 |
| Transmission or distribution system owner | Western Massachusetts Electric Company |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.2 MW |
| Average annual net hydropower generation | 3,455.6 MWH |
Four projects on the Chicopee River were transferred from Essential Power Massachusetts, LLC to Nautilus Hydro, LLC (a subsidiary of Patriot Hydro) in May 2017: Dwight (p-10675), Redbridge (p-10676), Putts Bridge (p-10677), and Indian Orchard (p-10678).
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

