MA
Putts Bridge P-10677
General information | |
Waterway |
Chicopee River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-10677 |
FERC project name | Putts Bridge |
Permit issued | 9/6/92 |
Ownership and operation | |
Owner | Nautilus Hydro, LLC |
Owner type | Wholesale Power Marketer |
Year first online (conventional hydro) | 1918 |
Transmission or distribution system owner | Western Massachusetts Electric Company |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 3.2 MW |
Average annual net hydropower generation | 12,891.1 MWH |
Four projects on the Chicopee River were transferred from Essential Power Massachusetts, LLC to Nautilus Hydro, LLC (a subsidiary of Patriot Hydro) in May 2017: Dwight (p-10675), Redbridge (p-10676), Putts Bridge (p-10677), and Indian Orchard (p-10678).
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition