ID

Dworshak

General information

Waterway  Clearwater River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit US Army Corps of Engineers

Ownership and operation

Owner USCE-North Pacific Division
Owner type USACE
Year first online (conventional hydro) 1974
Transmission or distribution system owner Bonneville Power Administration

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 465.0 MW
Average annual net hydropower generation 1,767,806.4 MWH

Is there something you’d like to add or correct? Please let us know.