Friant Hydro Facility P-2892
General information | |
Waterway | San Joaquin River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2892 |
Permit issued | 9/25/1982 |
Permit expires | 8/27/2032 |
Ownership and operation | |
Owner | Friant Power Authority |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1985 |
Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 37.5 mW |
Average annual net hydropower generation | 75,312.9 mWH |