ME
Indian Pond P-2142
General information | |
| Waterway |
Kennebec River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2142 |
| FERC project name | Indian Pond |
| Permit issued | 1/9/04 |
| Permit expiration | 10/27/36 |
Ownership and operation | |
| Owner | Brookfield White Pine Hydro, LLC. |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1954 |
| Transmission or distribution system owner | Central Maine Power Co |
Power and generating capacity | |
| Number of units | 4 |
| Total capacity from hydraulic turbine-generator units within each plant | 76.4 MW |
| Average annual net hydropower generation | 225,994.4 MWH |

Harris Station Dam, also known as the Indian Pond Project, on the Kennebec River. This is the put-in for the Kennebec Gorge whitewater section. Photo by Mark Zakutansky.
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

