AL
Millers Ferry
General information | |
Waterway |
Alabama River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-Mobile District |
Owner type | USACE |
Year first online (conventional hydro) | 1970 |
Transmission or distribution system owner | Alabama Power Co |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 101.1 MW |
Average annual net hydropower generation | 319,063.2 MWH |